[100% Valid Questions From Google Drive] Direct Download High Success Rate Microsoft 70-463 Dumps | Microsoft SQL Server 70-463 PDF Exam Preparation for Microsoft Video Series Available Now

Recently, Microsoft 70-463 dumps questions and answers, attaching more attention from more and more people in IT industry, has become an important standard to balance someone’s IT capability. Pass4itsure direct download high success rate Microsoft https://www.pass4itsure.com/70-463.html dumps, Microsoft SQL Server 70-463 pdf exam preparation for Microsoft video series available now!

Exam Code: 70-463
Exam Name: Implementing a Data Warehouse with Microsoft SQL Server 2012
Updated: Aug 17, 2017
Q&As: 230

[100% Valid Microsoft 70-463 Dumps Questions From Google Drive]: https://drive.google.com/open?id=0BwxjZr-ZDwwWSHdVQTJwd19hV3c

[100% Valid Cisco 400-201 Dumps Questions From Google Drive]: https://drive.google.com/open?id=0BwxjZr-ZDwwWV2ZxQlJ2OGxkaXc

70-463 dumps

Pass4itsure Free Microsoft 70-463 Dumps Exam Questions and Answers:

QUESTION 1
Which of the following is the Cable Modem (Cable-TV) Working Group?
A. IEEE 802.9
B. IEEE 802.11
C. IEEE 802.14
D. IEEE 802.3
70-463 exam Correct Answer: C
QUESTION 2
In buildings that will contain the telecommunications systems, NEC requirements address the adequate
electrical environment for reliable and error-free operation of the installed equipment.
A. False
B. True
Correct Answer: A
QUESTION 3
Between the late 60’s and until 1984, what was the service that was to help architects and engineers better
design and implement pathways and spaces in commercial buildings for telephone communications?
A. BICS
B. AT&T
C. CREDFACS
D. GTE
E. BICSI
70-463 dumps Correct Answer: A
QUESTION 4
Which of the following should be used as a guideline for estimating space requirements of optical fiber and
coaxial cable cross-connections in a TR?
A. 3 sq. in. for each fiber pair to be patched or cross-connected.
B. 2 sq. in. for each fiber pair to be patched or cross-connected.
C. 4 sq. in. for each fiber pair to be patched or cross-connected.
D. 1 sq. in. for each fiber pair to be patched or cross-connected.
Correct Answer: B
QUESTION 5
Which of the following is the Standard for the Installation of Lightning Protection Systems?
A. NFPA-780
B. NFPA-70
C. NFPA-72
D. NFPA-75
70-463 pdf Correct Answer: A
QUESTION 6
________is the total opposition (resistance, capacitance, and inductance) a circuit, cable, or component
offers to the flow of alternating current.
A unit of measure expressed in ohms.

Correct Answer: Impedance
QUESTION 7
The ability of a device, equipment, or system to perform without degradation in the presence of an
electromagnetic disturbance is called what?
A. Electromagnetic immunity.
B. Electromagnetic compatibility.
C. Electromagnetic induction.
D. Electromagnetic disturbance.
70-463 vce Correct Answer: A
QUESTION 8
A product is listed after it successfully completes a series of which of the following test?
A. Mechanical
B. Regulatory codes
C. Electrical
D. Thermal
Correct Answer: ACD
QUESTION 9
Distribution cable is that part of the loop that connects the customer location to the customer feeder cable.
A. True
B. False
70-463 exam Correct Answer: A
QUESTION 10
ANSI/TIA/EIA-758 is the standard for which of the following?
A. Customer-Owned Outside Plant Telecommunications Cabling Standard.
B. Technical Specifications for 100 Ohm Screened Twisted Pair Cabling.
C. Propagation Delay and Delay Skew Specifications for 100-Ohm 4-Pair Cable.
D. Residential Telecommunications Cabling Standard.
Correct Answer: A
QUESTION 11
The CEC is revised every four years.
A. True
B. False
70-463 dumps Correct Answer: A
QUESTION 12
Which of the following is the standard for “Recommended Practice for Installation Design and Installation
of Valve Regulated Lead-Acid Storage Batteries for Stationary Applications”?
A. ANSI/IEEE C62.41
B. ANSI/IEEE C62.45
C. ANSI/IEEE P1188-1996
D. ANSI/IEEE P1187-1996

Correct Answer: D
QUESTION 13
For design purposes, which of the following would be the typical size range of a 4-pair 100 ohm UTP or
ScTP (FTP) cable?
A. .50 in to .75 in
B. .14 in to .25 in
C. .31 in to .43 in
D. .11 in to .18 in
70-463 pdf Correct Answer: B
QUESTION 14
In what year was the TIA formed?
A. 1985
B. 1965
C. 1958
D. 1956
Correct Answer: A
QUESTION 15
In an “underfloor duct system”, the distribution ducts carry cables from the TR to the feeder ducts.
A. False
B. True
70-463 vce Correct Answer: A
QUESTION 16
What is the standard floor space allocation used in an office environment for one individual work area?
A. 100 square feet.
B. 50 square feet.
C. 150 square feet.
D. 75 square feet.
Correct Answer: A
QUESTION 17
NRZ is the acronym for which of the following?
A. Non-return to zero.
B. Nominal return zone.
C. Network registration zone.
D. Normal return zone.
70-463 exam Correct Answer: A
QUESTION 18
Which of the following is the international standard for premises cabling?
A. ISO/IEC 18010
B. ISO/IEC 11801

Correct Answer: B
QUESTION 19
The inadvertent transposition of two conductors of separate pairs is called what?
A. Twisted pair
B. Transposed pairs
C. Reversed pair
D. Split pair
70-463 dumps Correct Answer: D
QUESTION 20
A “wye” is a power system in which only one point is grounded.
A. False
B. True
Correct Answer: B
QUESTION 21
Improper grounding of telecommunications pathways may increase susceptibility of EMI.
A. True
B. False
70-463 pdf Correct Answer: A
QUESTION 22
FOTP is an acronym for which of the following?
A. Fiber Optic Test Procedure.
B. Fiber Outside Termination Point.
C. Frequent Optical Transmission Problems.
D. Fiber Optic Transition Point.
Correct Answer: A
QUESTION 23
A “sag” is a decrease in normal root mean square (rms) voltage or current lasting 0.5 cycles up to one
minute.
A. False
B. True
70-463 vce Correct Answer: B
QUESTION 24
Which of the following is an address used to uniquely identify each device on a LAN with an address
coded in the network interface card?
A. MAC
B. TCP
C. IP
D. Physical Layer
Correct Answer: A
QUESTION 25
In what year was BICSI formally incorporated?
A. 1977
B. 1984
C. 1967
D. 1940
70-463 exam Correct Answer: A
QUESTION 26
In the ceiling zones method of ceiling distribution, divide the usable floor area into zones of how many
square feet?
A. 2000 to 2500 square feet.
B. 2500 to 3000 square feet.
C. 365 to 900 square feet.
D. 1000 to 2000 square feet.
Correct Answer: C
QUESTION 27
In a computer or control room where the plenum is used for heating, ventilating, and air-conditioning, the
finished floor height should be a minimum of how many inches?
A. 8 inches.
B. 12 inches.
C. 2 inches.
D. 6 inches.
70-463 dumps Correct Answer: B
QUESTION 28
Which of the following would be the medium duty concentrated load capacity of an access floor in an
equipment room?
A. 100 lbs/square ft.
B. 50 lbs/square ft.
C. 1000 lbs/square ft.
D. 2000 lbs/square ft.
Correct Answer: D
QUESTION 29
Freestanding and cornerlock access floors consist of panels that are supported solely by pedestals.
A. False
B. True
70-463 pdf Correct Answer: B
QUESTION 30
An offset in a conduit run should be considered the equivalent of a 90 degree bend.
A. True
B. False
Correct Answer: A
QUESTION 31
An is responsible for the detailed design of new systems and/or the integration of a design into an existing
system.
A. True
B. False
70-463 vce Correct Answer: A
QUESTION 32
What is the typical slab thickness requirement for a two level underfloor duct system where feeder and
distribution ducts intersect?
A. 4 inch.
B. 5 inch.
C. 6 inch.
D. 7 inch.
Correct Answer: D
QUESTION 33
When designing an underfloor duct system, which of the following would be the cross-sectional area of the
duct serving each 100 square feet of floor space with 3 cables to each of the work areas.
A. 3 square inches.
B. 4 square inches.
C. 1 square inches.
D. 5 square inches.
70-463 exam Correct Answer: C
QUESTION 34
A third bend is acceptable in a pull section shorter than 33 ft. in length?
A. False
B. True
Correct Answer: B
QUESTION 35
In an underfloor duct system, pre-set inserts should be leveled to 1/8 inch below the finished pour.
A. False
B. True
70-463 dumps Correct Answer: B
QUESTION 36
An underfloor preset insert must be used in a post-tensioned pour.
A. True
B. False
Correct Answer: A

Many IT candidates are confused and wonder how to prepare for Microsoft 70-463 dumps questions and answers, but now you are lucky if you read this article because you have found the best method to prepare for the https://www.pass4itsure.com/70-463.html dumps exam from this article.